Twice as good, because we work twice as hard

We staff the finest Service Technicians, Mechanics, Electricians and Installers in the Industry. We have worked for decades to assembly this team of personable and professional individuals.

There are many different fields of expertise and we have developed a team with a wide array of knowledge and experience. If you need highly qualified Riggers and Mechanics to remove your press and load out trucks or containers, we have them. If you need a highly skilled mechainc to assist your crew with in field cylinder swap outs and iron to iron settings, we have you covered. If you need precise and thorough Installers to install your new press, we have the best level and tram experts around. How about start up and training, we can take care of that too. A folder specialist, no problem. If you need a high quality Press Electrician who specializes in Fincor Drives, we have the best.

Our long term team members are organized and caring professionals. We are focused onyour success and understand that our continued succes hinges on yours. These are mature and talented experts who have traveled the world and will exceed your expectations.

We have experts ready to travel. Please call or email and allow us to quote your project.

Service


We don't rely on our reputation, we build it.

Project by project, our services are designed around your business. All installations are preceded by on-site meetings to ensure that we accurately determine your needs. From electrical and flooring assessments to space planning and site locations, we will see you through the process. Once the equipment is installed, we make ourselves available for training and questions anytime - that's a warranty that never runs out. In the age of new technology, Impressions Worldwide has not forgotten that it's the people who run the presses. Our commitment is to work with everyone involved in the project, and our experience is the key to your success.


Services Offered:
  • Installations anywhere in the world
  • Press Moves
  • Emergency Service Calls
  • On-site Repairs
  • Replacement Parts
  • Auxiliary Equipment
  • Consulting
  • Training


Rabu, 29 September 2010

DGM 2004 3 Tower


Goss SC/SSC Rebuilt Quarter Folders



SC or SSC Rebuilt Quarter Folders
·         Sold on an “Exchange” Basis

·         Rebuilt to Original Specifications

·         One Year Warranty

·         Typically Available in 30 Days

·         Delivery and Installation Available

GOSS Urbanite CPIR


The “CPIR” Unit

Cleaned, Painted & Inspected with New Rubber Rollers



Urbanite Units from our Inventory

Thoroughly Inspected and Cleaned

Badly worn or broken parts replaced

All good Plate and Blanket Cylinders

All good Copper & Stainless Rollers

All good Chrome Rollers

Ready to install and run in production

New Rubber Rollers installed

Painted an original Goss color per the Customers request

All Connecting Parts included for installation.

Guarantied to Print Industry Standards when Installed by WGS

GOSS SC/SSC two high Reconditioned


Reconditioned Defined


The following list is standard for reconditioned Goss SC/SSC units:
1.      Dismantle entire unit down to side frames.
2.      The unit and all necessary connecting parts, top iron, etc. are thoroughly cleaned
3.      All frames and parts are re-painted to original specifications.
4.      Side frames and bores are inspected and re-bored for oversize cylinder sleeves as required.
5.      All bearings are replaced
6.      Bushings are replaced as required.
7.      Cylinders are replaced with remanufactured Stainless Steel cylinders as required.
8.      Ink fountain rollers are replaced with remanufactured 316L Stainless Steel Rollers.
9.      Micro-Metric rollers are replaced with new rollers.
10.  All ink fountain blades and seals are replaced with new components.
11.  All water oscillator  and water pan rollers are replaced as required.
12.  All Rylsan or Copper ink oscillators are replaced as required
13.  Ring and pinion gears replaced with new as required
14.  Internal drive line replaced with new as required.
15.  Replace all nuts, bolts, fasteners etc., with new.
16.  Replace all rubber rollers with new.
17.  All gearing is thoroughly inspected and replaced as required.
18.  Inspect and repair or replace as required all other parts including electrical motors.
19.  Reassemble unit using all factory specifications, settings and adjustments.
20.  Test run unit at top rated speed, perform all electrical, mechanical and pneumatic checks. 
21.  Prepare unit and all connecting parts with rust proof protective wrapping for shipment.
22.  Load and secure on board truck or container as required

ESTEVAN 4 Tower Goss sc



Enkel & Martin Splicer Reconditioned



Reconditioned Defined

The following list is standard for reconditioning Splicers:
1.       Dismantle as required for thorough inspection.
2.       The splicers and all necessary connecting parts, top iron, etc. are thoroughly cleaned
3.       All frames and parts are re-painted to original specifications per customer request.
4.       Bearings are replaced as required
5.       Chains are replaced as required.
6.       Replace all nuts, bolts, fasteners etc., with new.
7.       Replace all vacuum rollers with new as required.
8.       All pneumatics are thoroughly inspected and replaced as required.
9.       Inspect and repair or replace as required all other parts including electrical motors.
10.    Reassemble unit using all factory specifications, settings and adjustments.
11.    Test Splicer and perform all pre-installation electrical, mechanical and pneumatic checks. 
12.    Prepare unit and all connecting parts with rust proof protective wrapping for shipment.
13.    Load and secure on board truck or container as required

Upper Former GOSS Reconditioned


Warranty:
180 Days parts warranty:  Web Goss Spesialist Inc warrants this equipment to be free from defects in material and workmanship.  WGS agrees to repair or replace, at it’s option, without charge for parts for any item proven to be defective in material or workmanship under normal use, within six months after delivery, provided that purchaser shall WGS prompt notice of such defect.  WGS shall not be liable for any parts replaced, repairs, modifications, or changes made by others, or for any defects resulting from shipment, or improper installation (if done by others), or improper operation, or inadequate maintenance; and in no event shall WGS be liable for losses arising from or in connection with this transaction. This warranty does not include labor, freight, or replacement of consumable items.